New ProjectTop PropertiesRental PropertyResidential Commercial Post Your PropertyHome LoanAbout usContact

All India »Delhi / NCR | Gurgaon | Noida more...


Harmony In Gurgaon

Home » Top Property » Harmony In Gurgaon


Overview


Project Type

:

Residential Project

Built up Area

:

Bedrooms

:

Location

:

Gurgaon

Price Range

:

82 lacs & above

Posted On

:


Quick Enquiry
 Name :-
 Email :-
 Contact No. :-
 Property Type : Residential: Commercial
 Interested in :
 Query :-
Enter captcha :-  
 

 

 

Project - Unitech Harmony

Builder - Unitech

Location -Located in Sector 50, Gurgaon, on the proposed 130 metre road

Unitech Harmony is all about the things that you always wanted in a community and at home. Harmony. The name says it all. 2-4 bedroom apartments of international standard with fitted modular kitchens and air conditioning in every room are placed within a setting of pristine natural beauty. With 80% of the land as open and green space, every bit has been designed to restore within you and your family the inner harmony that we all seek, but, which is next to impossible to find in a city.

* Starting from (INR) Rs. 82 lacs & above

Unit Type: 2, 3 & 4 BR Apartments

Size: 1724 - 3331 Sq.ft.

Description of the project Features :

  • With 80% open green space, every bit of Harmony, has been designed (by renowned architects Mani Chowfta) , to restore within you and your family the inner harmony that we all seek, but, which is next to impossible to find in a city.
  • Spread over 10.57 acres, this residential complex has 2, 3 & 4 bedroom apartments of international standard with fitted modular kitchens and split unit air-conditioning in every room. 100% power back up, & 24 x 7 gated security along with door phones are two extremely important aspects that have been taken care of in all Unitech Residential Complexes.
  • Beautiful gardens, tranquil walkways, pebble acupressure paths, kids play zones, a state of the art club with all facilities, tennis courts, basketball courts, and other such amenities provide for a dynamic setting amidst pristine natural beauty.

Unitech Developer has brings new project in Sector 50 Gurgaon. Unitech Harmony with 2, 3 and 4 bedroom apartments with excellent amenities .

 

 

 


 

 

 Price List

 

PRICE LIST
(w.e.f. 01.07.2011)
 
Basic Sale Price (BSP)                                                                        :           As Applicable

External Development Charges (EDC)                                              :           Rs 125/- per sq. ft.
Infrastructure Development Charges (IDC)                                       :           Rs. 32/- per sq. ft.

Preferential Location Charges: 
For Ground Floor                                                                   :           Rs.  200/- per sq.ft. 
For 1st Floor                                                                          :           Rs.  150/- per sq.ft. 
For 2nd & 3rd Floor                                                                :           Rs.  125/- per sq.ft. 
For Corner/Tail Apartments                                                   :           Rs.  150/- per sq.ft. 
For Landscape Facing Apartment                                          :           Rs.  150/- per sq.ft.

Interest Bearing Maintenance Deposit                                               :           Rs.  75/- per sq.ft. 
External Façade Maintenance and Renovation Fund                         :           Rs.  25/- per sq.ft.
Covered Car Parking Space                                                                :           Rs.  3,00,000/- per parking
Club Membership and Registration Charges (Mandatory)
            Harmony Club                                                                                    :           Rs. 65,000/-
            Nirvana Patio Club                                                                 :           Rs. 1,25,000/-

*   Prices mentioned above are escalation free.

*    The Company would pay to the Allottee(s) Rs.5/- per sq. ft. per month of Super Area for any delay in offering possession of the Apartment beyond the period stipulated in the agreement to sell.  Similarly, the allottee(s) would also be liable to pay holding charges @ Rs. 5/- per sq.ft. per month of Super Area if the allottee(s) fails to take possession of the Apartment within 30 days from the date of issuance of the notice of possession.

*    The Maintenance Charges on the basis of Super Area of the Apartment as determined by the Company at the time of offer of possession of the Apartment shall be payable in advance for a period of three years before the Possession of the Apartment is handed over to the Allottee(s).   

*    One covered car parking is mandatory with each apartment.

*    The above Prices/Payment Plans are subject to revision/withdrawal at any time without notice at the sole discretion of the Company.

*    Service Tax, as and when applicable, shall be payable extra by the allottee(s)

Payment Plans

 

PAYMENT PLAN for Tower 8

                        
DOWN PAYMENT INSTALMENT PLAN 'A'
                                                                        Rebate 4% on BSP 
        
At the time of Registration                                                     : 15% of BSP 
         Within 45 Days of confirmation of Allotment / Registration : 80% of BSP + EDC + IDC + PLC + Parking
  + 50% of CMRC 
On Final Notice of Possession                                                : 5% of BSP + 50% of CMRC + Stamp Duty
  + Other Charges as Applicable                       

TIME LINKED INSTALMENT PLAN 'B'

At the time of Registration                                          : 15% of BSP 
Within 45 days of allotment                                       : 20% of BSP+ EDC + IDC
Within 90 days of allotment                                       : 20% of BSP+ PLC 
Within 120 days of allotment                                     : 20% of BSP + 50% of CMRC + Parking
Within 180 days of allotment                                     : 20% of BSP
On final notice of possession                                      : 5% of BSP + 50% of CMRC + Stamp Duty and 
   Other Charges as Applicable

*BSP - Basic Sale Price, EDC - External Development Charges, PLC - Preferential Location Charges, CMRC - Club Membership Registration Charges


(w.e.f. 01.07.2011)

PAYMENT PLAN for Tower 7

                        DOWN PAYMENT INSTALMENT PLAN 'A'
                                                                        Rebate 3% on BSP 
        
At the time of Registration                                                     : 15% of BSP 
         Within 45 Days of confirmation of Allotment / Registration : 80% of BSP + EDC + IDC + PLC + Parking 
  + 50% of CMRC 
On Final Notice of Possession                                                : 5% of BSP + 50% of CMRC + Stamp Duty
                                                                                                   + Other Charges as Applicable                       

TIME LINKED INSTALMENT PLAN 'B'

At the time of Registration                                          : 15% of BSP 
Within 45 days of allotment                                       : 30% of BSP+ EDC + IDC
Within 90 days of allotment                                       : 30% of BSP+ PLC 
Within 120 days of allotment                                     : 20% of BSP + 50% of CMRC + Parking
On final notice of possession                                      : 5% of BSP + 50% of CMRC + Stamp Duty
                                                                                       + Other Charges as Applicable                       

*BSP - Basic Sale Price, EDC - External Development Charges, PLC - Preferential Location Charges, CMRC - Club Membership Registration Charges



(w.e.f. 01.07.2011)

PAYMENT PLAN for Towers 4, 5
                        
DOWN PAYMENT INSTALMENT PLAN 'A'
                                                                        Rebate 2% on BSP 
        
At the time of Registration                                                     : 15% of BSP 
         Within 45 Days of confirmation of Allotment / Registration : 80% of BSP + EDC + IDC+ PLC
  + Parking + 50% of CMRC 
On Final Notice of Possession                                                : 5% of BSP + 50% of CMRC + Stamp 
                                                                                                   Duty + other Charges as Applicable                        

TIME LINKED INSTALMENT PLAN 'B'

At the time of Registration                                          : 15% of BSP 
Within 45 days of allotment                                       : 40% of BSP+ EDC + IDC
Within 90 days of allotment                                       : 40% of BSP+ PLC + Parking + 50% of CMRC
On final notice of possession                                      : 5% of BSP + 50% of CMRC + Stamp Duty
                                                                                       + Other Charges as Applicable                       

*BSP - Basic Sale Price, EDC - External Development Charges, PLC - Preferential Location Charges, CMRC - Club Membership Registration Charges

(w.e.f. 01.07.2011)

PAYMENT PLAN for Towers 3
                        
   DOWN PAYMENT INSTALMENT PLAN                                                                  
At the time of Registration                                                     : 15% of BSP 
         Within 45 Days of confirmation of Allotment / Registration : 80% of BSP + EDC + IDC+ PLC + Parking 
  + 50% of CMRC 
On Final Notice of Possession                                                : 5% of BSP + 50% of CMRC + Stamp 
                                                                                                   Duty + other Charges as Applicable                       

*BSP - Basic Sale Price, EDC - External Development Charges, PLC - Preferential Location Charges, CMRC - Club Membership Registration Charges

SPECIFICATION

 
Wall Finish
Internal : Acrylic emulsion paint / ceiling in distemper
External : Combination of stone and textured paint
Servant Room

: Painted in Oil bound distemper
Flooring
Living & dining  : Imported marble
Bedrooms : Laminated wood flooring
Servant Room

: Ceramic Tiles
Kitchen
Fully fitted modular kitchen with refrigerator, oven, hob and chimney
Flooring : Ceramic Tiles
Dado : Granite above counter / ceramic tiles on non-counter walls upto 1500mm above floor
Fittings : Granite counter with twin bowl stainless steel sink drain board and CP fittings

Toilets
Flooring : Ceramic Tiles
Dado : Ceramic tiles up to ceiling level
Fixture & Fittings

: Granite / marble counter, white ceramic fixtures & CP fittings, geysers, jacuzzi in master bedroom toilet, shower stall in all toilets

Doors
Seasoned hardwood frames with European style moulded shutter

Windows
Powder coated / Anodized aluminum

Green Area
Children's park, event lawn, picnic garden, kick-about area, exercise garden, play courts

Electrical
Provision for cable T.V.

Building
Sufficient car parking facility per apartment, earthquake resistant RCC framed construction 

Security
Door phone

Power back-up
100%

 

 

  • 100% power backup
  • 24x7 security
  • Split unit air-conditioners in bedrooms, living and dining areas

 

Facilities & Club

  • Swimming pool
  • Kids pool
  • Gymnasium
  • Squash court
  • Kids rooms 
Property Seller Detail
Contact Person :- Mr. Rajendra Mehta
Mobile :- 9971110060/9811108687
Contact Address :- SF-30 & 31, Galleria Shopping Complex, Opp. DLF City Club, Dlf City Phase IV, Gurgaon, Haryana, India